The Mythical Man-Month This book, a classic reference on software engineering, is a collection of essays in which the author, Frederick P. Brooks, presents his experiences as a manager in a large development project.
Although this is a book of more than 30 years, reflecting experiences of a project 20 years ago, this book is proving valuable. Rather than focusing on outdated technical problems the project focuses on the organizational problems of the same, and how to manage the people involved in them.
Then I will summarize each of the chapters that are part of this book:
1. Well tar
software projects as a tar pit, in which one enters without realizing it and, when problems begin, fighting them only makes you sink more.
no apparent reason for the difficulty of the projects, but an accumulation of factors. To understand the nature of this problem is necessary to identify the purpose of programming and the joys and difficulties involved.
There are several software products based on the end user requiring more or less design, integration and testing, and involve different degrees of effort. A product that will be used by other effort is the triple a program for private use. A program that will be used in a triple effort is one that will be used independently. These implications are independent, so a software product that will be used by system costs nine times more effort than a separate program for private use.
programming provides the satisfaction of creating complicated things that are useful to others. It is so malleable that it can do almost anything. However, they suffer the need for perfection and to be working with objectives set by others.
2. The myth of the month-person The main cause of project failure software is the deviation from the estimated planning. This is due to optimistic when estimating by programmers who do not take into account that initial ideas may be incomplete and even misleading. In addition there is a lack of reliable data on the estimates, making it difficult to justify estimates that go against the interests of the manager or the customer. When
estimate, usually fall into the trap of believing that people and months are interchangeable. Forget that adding more people to a task increases the total effort necessary because of the need to reorganize the tasks, to train new members and increased intercommunication.
Brooks's Law states: "Adding people to a late software project makes further delay."
As a general rule, Brooks proposes to divide the project time as follows: 1 / 3 for design, 1 / 6 for coding, 1 / 4 for testing of components and 1 / 4 for system testing.
3. The surgery team Good programmers are more productive than bad. In addition, the teams, the smaller less intercom problems have.
must facilitate the work of good programmers to simplify the communication within the team.
Small teams are too slow for large systems and, moreover, a team of many people is expensive, slow and inefficient, and produces systems that are not conceptually integrated.
One solution is to have a team organized around a lead programmer who supports, in the same way that a surgical team. In this way it can maintain the integrity of a product from a small number of minds with the help of a few employees, reducing communication dramatically.
4. Aristocracy, democracy, and systems design The most important consideration in designing a system to preserve the conceptual integrity. Integrity concept provides greater ease of use, and to build and test the system more quickly.
To achieve this, the design must be the result of a single mind or a small group of minds that disagree. The separation between architecture and implementation is the way of achieving this conceptual integrity in large systems.
Someone must control the setting concepts of architecture, but it enhances creativity in the implementation, since it allows to focus the effort.
Anyway, architecture (requirements), implementation (design) and implementation (programming) can run in parallel.
5. The effect of the second set Good communication can give the architect a proper reading of the costs and builder confidence in the design, without blurring the clear division of responsibilities between them.
For the architect can successfully influence the implementation must take into account that:
- is the developer who is responsible for implementation. The architect alone suggests.
- The architect must be able to suggest one way to implement what is specified, but be prepared to accept any other equally valid.
- should listen to suggestions from the manufacturer to improve the architecture. The
second system is the most dangerous, because it tends to over-designed. Assign a priori values \u200b\u200bof memory and time for each function helps detect overdesign during implementation.
6. Pass the word When drafting the design of a system, however large, it is best to do so few people (preferably one) so that the result is consistent.
much is needed to provide a formal description accuracy as a prose description to provide clarity. One of these must be the reference and the other to serve as support. Using an implementation as a definition is a source of problems.
is important to record and publish all queries from developers to architects.
7. Why the Tower of Babel fell? no communication
If everyone does their own assumptions, causing delays, functional mismatch and system errors. Teams must communicate all possible ways, both informally and formally.
must be specified as soon as all the documents through which formal communication will occur in the project. This documentation must be available to any team member. It must constantly update and highlight the changes made in the latest version.
However, Parnas proposes that no one should see the internals of any other party other than the one in which you are working. Only required to publish the interfaces.
The organization should undertake to reduce the amount of communication and coordination required by the division of labor and specialization in functions.
Each project must establish two roles, the producer and the architect or technical director, which require different skills.
8. Aiming to shoot can not estimate the total project effort estimating the coding time and extrapolating to other tasks. Nor does extrapolate
construction of small-scale systems projects. The increase in effort is a power the size of the project.
There are studies that say that developers spend only 50% of their time programming and the rest to other tasks.
Other studies indicate that the productivity remains constant in terms of elementary strings. Productivity is increased by 5 when going to use a high-level language.
9. 10 pounds in a bag of 5 addition to the time of execution, the memory space occupied by a program is its major cost. It should establish size limits for each function costs under control.
During implementation, the architects should ensure the continued integrity of the system.
To make a good balance between time and space, the team must be trained in the specific programming language and machine being used.
All programming project needs a library of standard components.
simple and fast programs are the result of innovation strategy rather than a tactic. This can be achieved through the use of a new algorithm or redo the presentation of data.
10. The documentary hypothesis Only a few of all project documents are the axis around which revolves the entire project management: goals, manual, schedule, budget, organizational chart and physical location of team members.
The manager should formalize this set of documents. Keep these documents provides a mechanism for monitoring and alarm.
The manager must ensure that everyone is going in the same direction through the media, rather than making all the decisions. Only a small part of the task manager are related to information that is out of his mind.
11. Plans to get rid of one When you go from a protected environment to a production it is necessary to test an intermediate step. When testing the first system built is usually verify that this is too slow, large or difficult to use, and should be redesigned.
This redesign can be done at once or piece by piece, but we have to do it anyway. If you give the first set, this will be detrimental to the user and the developer that must be maintained. Should therefore be included in planning the redesign of the first solution.
Customer needs and perceptions of the same change as the project progresses. The malleability of software requirements makes do not hesitate to change because the changes are assumed easy. Some of these changes are valid and must be prepared to address them. Techniques that allow us to do this are known but not used.
developers' efforts are attempts to meet the requirements, subject to change and, therefore, makes them reluctant to document it.
To accommodate an organization to change the members of the interchangeable equipment and relocatable ben, on both the management and technique. One possible solution is the proposal to organize the team around a lead programmer.
Software maintenance consists mainly of repairing defects design, adding new features and adapt to changes in the environment or configuration. The maintenance cost of a program is about 40% of the cost of development.
The number of errors found increases with the number of users. The number of errors over the life of a project first increases and then stabilizes. Correcting an error
a high probability of introducing others, which should have test cases to ensure that this does not occur.
During the life of a project the number of modules increases linearly, but the number of modules affected by changes increases exponentially. All correction tends to break down the structure and increases the entropy and disorder in the system. Inevitably, there will come a point where the best solution is the redesign.
12. precise tools
Every project needs custom tools, so the manager must establish philosophy to establish the resources needed for its construction.
is necessary instruments to the machines on which they will try to extract results from them. When tested in the machine is best to allocate separate time periods for different members.
voluminous documentation introduces additional complexity to the project.
should build early performance simulator to analyze the program from the outside, and we must pay attention to what he says.
The best tools available today (1975) are high-level languages \u200b\u200b(improve performance and facilitate debugging) and interactive program (reduce the response time in debugging.)
13. The whole and the parts A good architecture makes a system easier to use, easier to build and has fewer errors. Before beginning construction specifications must be submitted to the test group, to be sure it is complete and clear.
Design of general to specific specification refining step reduces errors and allows you to go back when needed. You have to use a notation such high level as possible at each step.
Structured programming is the design of programs consisting of a reduced set of control structures.
is shown that in the first interaction debug progress for three times higher than in subsequent ones. Debugging a system always takes longer than planned.
debugging should begin only when the pieces seem to work, instead of forward to when errors were detected but are still not fixed.
worth building code for debugging support, which can be 50% of the code to debug.
During debugging components must be added one at a time. It is better to introduce major changes on an infrequent basis because it introduces fewer instability.
14. Envisioning a catastrophe projects are delayed every day. This is difficult to recognize, prevent and fix. To control a project is necessary to have a calendar with specific and well defined milestones and dates identified.
Several studies have shown that the estimates do not tend to vary until the start of the project, then significant narrowing of the over-and, three weeks before the end of the project's estimated that change are underestimates.
critical path planning to identify deviations that are what really matter. It should identify the critical path as soon as possible.
Every chief needs to be alerted of the exceptions that require corrective actions and display the status of the project for information. This is difficult because subordinates are afraid the meddling of the chief responsibilities. Should be available to offer technical review of project status throughout the world.
15. The other side Documentation user is as important as the product itself. It is also important for the author as a memory of what has been done.
Generally not good documentation is delivered because no developers have been instructed on how to do this effectively and economically.
critical documentation for the user must be set before construction because it contains basic planning decisions.
level of internal documents, to maintain updated documentation must be incorporated along with the source code. This should explain why things are as they are, not just how they are made. The high-level languages \u200b\u200ballow technical self-documentation within the code itself.
16. There is no silver bullet - Essence and Accident The author compares the development of software with werewolves, ordinary people who suddenly turns into something out of control that can only be removed with a silver bullet. However, there are no silver bullets for the software to give an improvement of an order of magnitude in its development, although there are innovations that together they can provide this improvement.
software construction involves complex, to accommodate their conceptual structures, and incidental tasks, represent them in programming languages.
essential difficulties software development are the complexity, compliance, variability and invisibility when it comes to accommodating the complex conceptual structures involved.
Software development also involves incidental tasks, which are represented in programming languages.
improvements have recently been focused on solving the incidental problems through:
- High-level languages. Runtime
- shared.
- unified programming environments.
However, most of the time is spent to accommodate abstract conceptual structures of great complexity and, therefore, is this task essential to be attacked. Have proposed the following ways:
- Advances in high-level languages.
- Object-Oriented Programming.
- artificial intelligence.
- Expert Systems.
- Automatic programming.
- graphic programming. Verification
- programs.
- environments and tools.
- Workstations.
These alternatives, although they make improvements, have not reached expected levels. We need to hit the essence of raising the level of software abstraction that means development. The most promising developments in this regard are:
Buy
- instead of developing.
- refining requirements and rapid prototyping.
- incremental development.
- Finding and educating the best designers.
17. "There is no silver bullet" revised In this chapter the author rejects the criticism the paper presented in the previous chapter "There is no silver bullet." Especially those that go against the main argument of the same (there is no progress in the world of software that can give itself an improvement of n order of magnitude) to present its own silver bullet for each investigator on duty. The
author reaffirms the idea that complexity is the major difficulty inherent in the software, but most of this complexity is often due to organizational problems from the reality that attempts to model. This complexity can be attacked by increasing the level of abstraction of the elements used and always keeping operating systems and incorporating new features incrementally.
approach is introduced to quality, which would increase productivity by reducing the time spent correcting errors.
also increases productivity with better equipment and tools and the use of object-oriented programming (which promotes modularity, encapsulation, inheritance and data typing). Although he laments the lack of introduction of object orientation and reuse.
18. Selection of "The Myth of the month-person" This chapter presents a compilation of the statements described in the book as a summary.
19. "The myth of the month-person" 20 years after This chapter is a review of the book made after 20 years by the author. It makes the case that remains after this time and those which have changed your mind.
The author maintains that conceptual integrity is the factor more important for ease of use of a system. This conceptual integrity is usually achieved when the product has been designed by one person, but this approach is not productive for large systems suffer competitive pressures.
In these environments is necessary to have an architect (or a group of them organized in a hierarchy) which is responsible for the conceptual integrity of all aspects of the proceeds received by the user. Besides, his tasks will be separated from implementation.
Another danger is emphasized in the development of loading systems is the minimum value of features that complicate the design and use of them. Be aware of who you are users and consider the new capabilities being introduced on the basis of greater value provided the greatest number of users.
As you change your mind is on the board that the first system implemented must be discarded. This was a consequence of the implementation of the cascade development, which assumes that the project steps move one after another, and assume that all are done correctly. The system is built at one time and it is assumed that all errors are introduced in the implementation.
incremental development model would allow progressive refinement of the system. You can build an initial system of limited functionality, and from which to grow the system by introducing new features. This will be further testing of the system and can deliver a system that works when needed, but reduced functionality.
regard to the concealment of information and Parnas suggested that the author was suspicious, it retracts and assumes that programmers are more effective if they are exposed to the internals of modules that are not owned.
Advances in software development will occur with increasing level of abstraction of the elements used. In this sense we have taken the following steps:
- The definition of information hiding modules made by Parnas.
- The emergence of abstract data types which can lead to other objects.
- object-oriented programming.
The availability of classes designed and tested for reuse is what would raise the level of abstraction.
Brooks Act (add more people to a late project delay it more) has been refined through several studies, although it remains a good approximation to reality. In fact, adding more people to a late project cost increases, but not always delayed.
Another idea has been strengthened during this time is the importance of people part of the project, and how human factors should be taken into consideration. It is important to give responsibility to people and not to centralize everything into a single entity, as this encourages creativity.
Echoes of progress in the field of computing and the explosion in the number of computers. This has changed the way we develop software and created a new industry, packaged software.
regards the future of software engineering, it assumes that, through knowledge, will be able to cope in the future may be with the complexity of human behavior and the non-linear input.