Saturday, June 19, 2010

Make A Medusa Wig Online

In essence, because if the velocity and time-or

lose the essence of who I am. And just write. I was writing, I was writing, even the stupid. It is clear that the term commences things at breakneck speed and my fingers do not follow your compass. A pity, I can hardly reach the end of this sentence without doubt still remember when my fingers touch the keys, deep sound when touched, how important the message they send to the screen. The smell of a new page not remember, the wind forced the pages, noise, air from the leaf to be passed and no longer is. There comes a time when or run more than life or this is ahead of you. The real problem going forward is to lose what I said before, the essence. Te dominates time, requires you to all and no longer gives you time to do anything. Would say I have no time to write but nothing more than excuses, the real reason is not the time, is the life that no longer reached. I miss the time commitments meant no more than the word itself, which did not bear my life for me. I miss the look bad for not spend my life trying to get along with everyone and everything except myself. I miss the days in bed avoiding the job because if, because life was directed by me and not anything else. Echo less than having to go and not go, go and when you make you not go to what you were going, laugh when you have to mourn and mourn when he plays laugh. I miss the spontaneous madness, why if not more, because I feel like, why I feel so, no matter what else, the stop time here and today I'm late.

connection speed ....


I get dizzy.

Thursday, June 17, 2010

What Are The Different Kinds Of Waxing



Based on the book by Henrik Kniberg "Scrum and XP from the Trenches" , in this post what I want is to collect and explain briefly the main concepts that underpin Scrum . Let's separate

one hand the people involved in a project that follows this approach and, on the other hand, products and tasks to complete during the process Scrum proposed.

First the people :
  • Client: The person applying for a project in order to satisfy a need or their own business.

  • The owner of the product (Product Owner) : A person who acts as an intermediary between the customer (not technical) and the team and has capacity to decide on the requirements to be implemented.

  • team: It's personal technician who is responsible for implementing the project.

  • The Scrum Master: A person familiar with the Scrum process that is responsible for guiding the team and the product owner to follow the process determined by Scrum. If people involved in the project known as Scrum their work may not be necessary.

And secondly, the products and tasks required:
  • product stack: A prioritized list of requirements or "stories" of the client written using his own terminology, so not technical.

  • sprint planning meeting : At this meeting the team and the owner of the product traded on the scope of each sprint based on the estimates and the importance of each of the stories of the product stack.

  • sprint stack : The list of stories from the product stack up the scope of the current sprint.

  • scrum daily meeting: At this meeting the team discusses the problems to be found as the product moves and revises its estimates to pursue the project progress. Demonstration

  • : The culmination of each sprint must present a demonstration of what has been implemented, in order to obtain feedback on the project by interested enough to enable future sprints.

  • Retrospective: At the end of each sprint is held a meeting can review what has been done right and wrong during the sprint to the goal of improving the process.

Finally, to summarize briefly the process Scrum defines :
  • First, the product owner built product stack with user stories or project requirements. The battery product is not invariable, be modified as the project progresses and clarify the requirements.

  • Before each sprint , iteration of about 3 or 4 weeks, team and product owner meet to decide which stories product stack to be deployed there. These stories form the implementation of sprint battery . During

  • sprint, the team have a daily meeting sprint, which updates the progress of the project and try to resolve any problems.

  • sprint at the end of is carried out demonstration in which outlines the new features implemented during the sprint.

  • Before starting a new Springer t, carried out a retrospective in order to identify possible improvements in the way of working.


References:
applying Scrum and XP Agile methodologies

What is Scrum

Tuesday, June 15, 2010

Is Orajel Bad For Babies

Scrum Scrum and XP from the Trenches

Although I have read some time ago, now feel the need to reread the Henrik Kniberg book "Scrum & XP from the trenches" ( "Scrum and XP desde las trincheras” en su traducción al español ) en busca de ideas que aplicar para tratar de incorporarlas en las nuevos proyectos que voy a comenzar.

En este libro, disponible para su descarga gratuita, Henrik Kniberg cuenta sus propias experiencias durante la implantación de Scrum en la empresa en la que estaba trabajando. En él expone sus ideas acerca de cómo usar la metodología de desarrollo ágil Scrum .

El libro, con prólogos por parte de Jeff Sutherland y Mike Cohn , consta de los siguientes capítulos:
  1. Introducción : Según el propio creator of Scrum, Ken Schwaber, Scrum is not a methodology but a framework and, therefore, does not say exactly what to do. However, in this book, Henrik Kniberg itself says exactly what he does to implement Scrum. Nevertheless, cautioned that Scrum is a methodology to be adapted to the specific situation of each project.

  2. How do cells product: The product backlog is a prioritized list of requirements or "stories" of the client written using his own terminology, so not technical.

  3. do we prepare for the sprint planning : The owner of the product backlog and should have it ready when you are going to plan a sprint. The owner must understand all the user stories and assign them an importance.

  4. How do sprint planning : The sprint planning meeting is the most critical of Scrum. The goal of this meeting is to define a goal, the list of team members involved, the list of tasks to be developed, a demonstration date and time and a place for daily scrum meeting. In them, the product owner and the team negotiate on the scope of each sprint based on the estimates and the importance of each of the stories.

  5. Cómo comunicamos los sprints : Es necesario informar a todo el mundo de qué está ocurriendo en cada sprint. Para ello, después de la reunión de planificación del sprint se debe redactar una hoja de información del sprint que recoja los objetivos que se han definido. Esta hoja debe publicarse para todo el mundo.

  6. Cómo hacemos las pilas de sprint : Después de la reunío de planificación de sprint y antes de la primera reunión de scrum diaria, el Scrum master debe crear la pila de sprint. La pila de sprint es la lista de tareas que se realizan durante el sprint, con gráficos de avance de estas tareas (burndown). La forma más efectiva to show cell sprint through a board on the wall.

  7. how you distribute the equipment room : The most interesting discussions take place spontaneously in front of a blackboard dons can paint charts or graphics design. Team members can meet in front of this board and discuss the design at any time. It is also important that team members sit together to foster communication between them. The owner of the product should not be sitting with the computer to not be tempted to thrive in the details, but must itself be accessible to the computer if there is any doubt and you have to ask. The rest people should not interfere at all with the team.

  8. How do daily scrums : The best place for daily scrum is before the board with scrum pile. During the meeting, which should not last much longer than 15 minutes, the board must be updated with the progress the team has done.

  9. How do sprint demo : Having to do demonstrations to force the end of each sprint the team to get something done to show and promote the communication of what is being done within the team and other teams attending the demonstration. Demonstrations can also get feedback on the draft by the customer.

  10. C ow do the sprint retrospective : The retrospective is the second most important task, since it is the dropping down better. The retrospective is a meeting that takes place at the end of each sprint where the team presents its ideas about what things can be done better.

  11. breaks between sprints : After each sprint, which can be very intense, you need some time off to allow further assimilate new ideas or information.

  12. How do the planning and delivery of fixed price contracts : In some cases, usually attached to a fixed-price contract, you need to plan in advance the deliveries of several subsequent sprints. For this, the owner of the product requires estimates of the tasks included in the contract, which must be conducted in conjunction with the team. Based on these estimates and the speed of the team establishing the plan of deliveries over the next sprints. This plan can be modified as changes occur as the process moves forward.

  13. How combine Scrum with XP, Scrum and XP are complemented perfectly, since SCRM focuses on management and organization of the XP project and focuses on programming practices. Some XP practices are also inherent part of Scrum, as the concept of team, sitting together, the user stories and game planning. In addition, there are other practices that complement XP Scrum, like pair programming, test-driven development (TDD), incremental design, continuous integration, collective code ownership and standardization and work at a pace strong but sustainable.

  14. How we test: This is the hardest part of software development and more variable between different organizations. It necsario perform some manual acceptance test before taking a job done. However, can reduce this test phase by increasing the delivered code quality and increasing the efficiency of automated tests performed. Or even include any member of the team performs tasks tester. The tester is the person certifying that a task is completely finished. The acceptance tests do not fit into a sprint cycle, defined as acceptance cycles out of the sprint.

  15. Managing multiple Scrum teams : too big teams do not adapt well to the practices of Scrum because communication between all members is much more difficult. It is preferable to have several small teams a big one if the project permits. The ideal number of people appear to be between 5 and 9 people.

  16. How manage geographically distributed teams: Here we discuss various forms of gesrionar distributed teams, which can be very different teams in different locations or the same team with members distributed.

  17. Checklist Scrum Master: Here are listed the administrative functions of Scrum Master, tasks to be performed at the beginning, middle and end of each sprint.

This book is a great introduction to Scrum and lets start using this methodology along the lines that it is exposed. Then, through practice, practice can be improved upon based on what it really valuable.

References:
Scrum & XP from the trenches
Scrum and XP from the Trenches

Thursday, June 10, 2010

Tuition For Harvard And Yale

Design Patterns: Adapter Design Considerations

This pattern becomes the interface of a class into another which is what customers expect and allows cooperating classes that might not otherwise having incompatible interfaces.

Responsible for providing an interface client class needs to work on its implementation using a class or classes that do not comply with that interface.

The best way to see this pattern through an example. Suppose we have a class Customer performing complex mathematical calculations whose implementation is delegated to another class. Let us assume for example that these complex calculations can be an addition or subtraction. The interface required by this customer class for computations defined in the interface Calculator:
 com.roldan.adapter package; 

Calculator {public interface
public int sum (int Operator1, Operator2 int) public int subtract
(Operator1 int, int Operator2);}

To carry out these complex calculations are available in class processor that implements:
 com.roldan.adapter package; 


public class Processor {public static final int ADD = 1;
public static final int SUBTRACT = 2;
realizarOperacion
public static int (int
Operator1 , int
Operator2,
int operation) {
int result = 0;

switch (operation) {case
SUMA
Operator1 + result = Operator2;
break;
case SUBTRACT:
result = Operator1 - Operator2;
break ;


} return result;}


} In this case, despite the class processor performs the operations required by the Customer class, does not implement the interface it needs to use it. However, you can create a class adapter class to adapt the interface processor Calculator:
 com.roldan.adapter package; 

public class Calculator implements Adapter
{public int sum (int
Operator1,
Operator2 int) {return
Procesador.realizarOperacion (
Operator1,
Operator2,
Procesador.SUMA)


} public int subtract (int
Operator1,
Operator2 int) {return
Procesador.realizarOperacion (
Operator1,
Operator2,
Procesador.RESTA)
}}

Thus, the class Customer can use calculations performed in processor clse through class adapter, which fits the interface that needs the class Calculator Customer .

The following UML diagram reflect the relationships among these classes:

Adapter pattern in Wikipedia
Adapter Pattern in Wikipedia
Uncovered Design Patterns: The Adapter Pattern in Dzone
Adapter Pattern in OODesign.com
Otros patrones de diseño

Friday, June 4, 2010

Recommended Beginner Racquetball Racket



Este artículo está basado en el artículo de Martin Fowler “Is Design Dead?” y en su traducción al castellano realizada por Alejandro Sierra .

La verdad es que he descubierto en Martin Fowler una verdadera fuente de inspiración y de ideas sobre la ingeniería del software . En los últimos tiempos, basándome en sus artículos, estoy encontrando respuestas y reflexiones valiosas sobre los problemas que me afectan como desarrollador de software.

En este caso, llevo algún tiempo en conflicto entre la idea de realizar el diseño the beginning of the project, stopping all development until we have a clear vision, or begin to develop as soon as possible to have something to offer as advocated by Agile , even if it means redoing what has already been done when the ideas are clarified or vary .

In this article, Martin Fowler outlines his ideas on the design within an agile methodology as XP which apparently does not care.

There are two ways to approach the design, evolutionary design and layout planning:
  • During the evolutionary design the design is as that the system evolves as part of programming. This type of design usually ends in disaster because it ends up being an aggregation of ad hoc decisions that complicate and deteriorate the code design.
  • The planned design corresponds with the vision of any engineering design classic, where it is to anticipate problems in the abstract without entering the code until you have completed the design phase. However, it is difficult to anticipate all problems prior to beginning the program, which brings up tensions between developers and designers. Can also lead to changes in requirements that may be due changes in the business and therefore are very difficult to predict and control their effects.

XP evolutionary design advocates. However, for it calls for a number of practices to control the negative effects of this type of design. According to the curve software change, the change in programming costs increase exponentially as a project progresses, making the evolutionary design. But this curve can be flattened by a series of practices that reduce the effect of the changes. These practices are:
  • tests: to control the effect of introducing changes eviatndo new errors.
  • Continuous Integration: Allows the team in sync preventing the changes affect more people.
  • Refactoring: to clean the code and make it more maintainable and easy to modify.

In evolutionary design XP says that "we must do the simplest thing that can work" and not carry out anything not necessary (principle YAGNI - "You Is not Gonna Need It") . This is to keep the design as simple as possible doing only what estructamente necessary. For this there are two reasons: If
  • does something you do not need right now is committing an effort to hose who it is. In addition, you may be doing wrong for lack of information, it is better to postpone its implementation until we know more detail.
  • A complicated design is harder to understand and implement than a simple. Doing what is necasio have a simpler design and easy to implement.

However, this way of keeping the design simple adding later that is becoming necessary to go is only feasible if you are using the practices described above to reduce the cost of change.

As guidelines for what it is a simple design, Kent Beck exposes the following four criteria:
  • Running all the tests. Reveal
  • every intention of the code making it easier to read.
  • Avoid duplication.
  • The smaller number of classes and methods.

No need to waste too much time looking for the simplest design. Refactoring allows simplifying Irlo as to be understood. Nor is it good to use design patterns without rhyme or reason, it is best to let the evolutionary design to guide you to the use of a pattern that enter early.

Regarding the use of diagrams UML and XP said to be used if they are useful, but not in favor of its use. Diagrams can be useful for communication as long as they kept to the simplest possible. However, the use of diagrams is complicated when there are changes during the course of the project, because it is difficult to keep in sync with the code.

important thing in design is to avoid irreversible decisions. Thus the decision is not dramatic because bad decisions can be undone. In this sense it is important to have code control systems to ensure the reversibility.

is important to have people involved in design. Someone must ejecercer control over the project overseeing the design of the code and takes responsibility for it. These people should act when it detects that the design can be compromised or there are any technical difficulties during the project. This role is the technical leader. It makes no sense the role of architect, as there can be design by someone who then "walk away from the construction of software.

The design of a project can be measured in terms of the quality of the code base. If the quality of a project code base deteriorates and becomes more dificles work, then the design is insufficient. This is a subjective criterion but the technical people who first suffered the difficulty of making changes and who need to hear. According

Martin Fowler, the nature of siden has changed. Now seeking the following skills:
  • code is kept as clear and simple as possible .
  • be able to refactor , making design improvements where necessary.
  • know and recognize patterns and when evolution towards them.
  • ability to communicate the design through diagrams, code, and direct communication with other people.

summary, Martin Fowler calls for an evolutionary design that allows the development start early. But this can not be done anyway, it is necessary to introduce practices that facilitate change during development so that the design can improve and adapt to new needs as they arise.

This goes against a planned design that leaves everything for granted in a long initial phase is followed by a phase of implementation will in no changes are contemplated and, when incorporated it end up being absolutely unavoidable, they are difficult incorporate, breaking the previously established design and introducing a high propensity to errors.

Design many delegates evolutionary design work on the developers. There is no figure of the architect as someone who does all the design work, but as someone who supervises the work of these. There must be a capable and committed team to continue this way of working, otherwise, it is not feasible.

References:
Desing Is Dead? - By Martin Fowler
design Is he dead? - Translation of Alejandro Sierra
Examining the Cost of Change Curve Agile